Fixture Assembly
ASSEMBLY INSTRUCTIONS
6
Install a center spanner approx. 2’ above the splicer rail. Slide the upper peg board into the
uprights until it sits in the splicer rail. Install the top spanner onto the top prongs of the uprights.
CENTER
SPANNER
TOP SPANNER
UPPER PEG BOARD
SPLICER RAIL
SPLICER RAIL
LOWER PEG BOARD
LOWER PEG BOARD
7
If the assembly is laying on the floor, stand it upright. Install the base deck cover over the feet by
inserting the prongs at the back of the cover into the slots on the front of the 8’ uprights.
8
Lower the base deck cover over the front of the feet and secure. Then attach left and right base
deck side panels by sliding them over the feet.
BASE
DECK
SIDE
PANEL
BASE DECK COVER
FOOT